BESS project support for installers and EPCs
Define the battery, PCS, EMS and grid interfaces before procurement, from commercial sites to multi-MWh projects.
1 · Design inputs
Site, single-line diagram, load/PV profiles, available grid power, voltage, transformer and intended applications.
2 · Interface review
Confirm battery/PCS compatibility, protection concept, metering, EMS communications and third-party control interfaces.
3 · Delivery boundaries
Agree who supplies civil works, lifting, cabling, transformer/switchgear, connection studies, commissioning and acceptance tests.
4 · Handover and operation
Define documentation, operator training, monitoring access, warranty terms and service responsibilities in the project offer.
Request a technical review
Send the available project documents and identify open interfaces. Product selection and compliance documentation must match the specific equipment and country requirements.
Discuss your BESS project
Share the site and your role, intended application, grid connection power and voltage, target kW/kWh and timeline. Load profiles, PV data or a single-line diagram help us assess the technical scope.