BATTERY RETROFIT AND REPOWERING WITH HIS
Battery storage for existing solar parks
Add flexibility to your solar park. HIS assesses how battery storage, a German-developed EMS and suitable existing infrastructure can form a coordinated solution matched to your grid connection and operating model.
Request a battery retrofit assessmentShare what you already know. Technical documents and the final battery size can be clarified together in the next step.

What are you planning?
Add storage to an existing solar park
Equip an existing PV plant with battery storage. We assess site integration and the shared use of suitable infrastructure.
Combine PV repowering with storage
When modules, inverters or the connection architecture are modernised, storage integration can be included in the overall design.
Modernise an existing BESS
For replacement or expansion, we assess the battery, PCS, communications and remaining service life. The integration scope is defined against the specific system.
What the initial project review gives you
A suitable integration route
An initial technical assessment: direct AC integration, an additional transformer stage or a separate medium-voltage connection.
Potential for infrastructure reuse
Identify components that may be reusable and the information still needed to assess them.
Clear next steps
Agree open points with the EPC, network operator and trading partner, and define further engineering and quotation scope.
More flexibility for electricity sales
Shift solar electricity over time
Store solar generation for later sales windows. We consider generation profiles, contract terms, charging power and usable capacity together.
Manage export constraints
Store generation peaks where charging power, available capacity and later discharge windows allow.
Assess solar and grid charging
PV-led operation or mixed-source charging: import capacity, metering and electricity marketing are coordinated for the selected model.
Economics based on your site
The business case compares continued operation without storage against suitable BESS configurations. It includes investment and modifications, usable energy, losses and auxiliary consumption, degradation, service and trading fees. Generation data and realistic price scenarios help assess the additional value storage could create.
HIS agrees technical sizing and the data requirements with you. We define the scope of a detailed techno-economic study together.
The storage architecture follows your site
HISbatt PowerPack 800V
1.672–3.344 MWh installed energy with integrated PCS, for suitable 800 V AC busbars and transformer connections.
Product and configurations →Modular large-scale storage
5.015 MWh L20 battery containers with project-selected PCS and AC/MV integration. Power and energy are matched to the project.
Explore large-scale storage →Other connection voltages
For 400, 600, 660 or 690 V sites, we assess suitable system combinations and transformer options against existing equipment, connection limits and the operating model.
Compare voltage options →German-developed EMS and clear project responsibilities
HIS brings together battery, PCS and a German-developed EMS. Charging schedules, power limits and the trading interface are matched to the agreed configuration. HIS EnergyFlow provides visibility of energy flows and operating data.
- HIS: system selection, technical interfaces, commissioning and agreed support.
- EPC / installation partner: site planning, civil works and electrical installation unless expressly included otherwise in the HIS offer.
- Network operator: agreement and approval of connection conditions; protection, metering and plant controls are addressed in the plant design.
- Trading partner: market access, trading strategy and settlement. Balancing services require a separate review of technical eligibility and any required prequalification.
HIS storage projects in practice
Explore completed applications and system integration experience:
Bulgaria · Energy trading
3,260 kWh · 1,370 kW
View reference projects →Nice · Supermarket
1,165 kWh · 460 kW for energy trading and EV charger power support.
Explore the case study →Battery retrofit: frequently asked questions
Can an existing solar park be retrofitted with battery storage?
A retrofit is possible in principle. Grid access, available space, voltage architecture, protection, metering and the operating model determine the integration route. HIS reviews your existing site data to assess a suitable approach.
What is the difference between retrofit and repowering?
A battery retrofit adds storage to an existing PV plant. PV repowering modernises the generation plant. BESS repowering replaces or modernises existing storage. These projects can be combined but require different assessments.
Can the existing transformer station be reused?
Reuse is assessed against voltage, power, load profile, condition, protection, short-circuit capability and available connection bays. Both charging and discharge, as well as combined PV and storage power, are considered.
Does PV export approval also permit grid charging?
Export approval alone does not confirm import capacity for battery charging. Import and export limits and connection changes must be agreed with the network operator. Metering and electricity marketing must suit the operating model.
How is battery size determined?
We assess time-series generation data, connection limits, electricity marketing and operating windows. Power in kW or MW and usable energy in kWh or MWh are sized separately. Existing operation and suitable storage alternatives provide the basis for an economic comparison.
Is direct 800 V integration always possible?
It suits appropriately designed 800 V AC infrastructure. For other voltages, we assess suitable PCS, transformer or medium-voltage routes. The architecture follows the site requirements.
Can I retain my existing trading partner?
HIS assesses the partner’s technical interfaces and agrees operating limits, measurements and setpoint handling. Market access and settlement remain within the trading partner’s agreed responsibilities.
What do I need for an initial enquiry?
Start with available information about location, PV capacity, project objectives and timing. Connection data, a single-line diagram, transformer and inverter specifications and generation profiles can follow later. A final battery calculation is not required.
How could storage extend your solar park?
Share what you already know. Technical documents and the final battery size can be clarified together in the next step.
Location, PV capacity, project objectives and timing help us get started. A single-line diagram, generation data and other documents are optional. We then agree the next steps by email or, if you prefer, in a discussion.
Request a battery retrofit assessment